Centre Structure



Building the Centre Structure
The bow girder was fitted with fillets for the first plank, frame A, frame B and the top of the bow buoyancy tank.


The stern girder was fitted with fillets for the transom, frame D and the top of the stern buoyancy tank.


Centre structure viewed from aft end. Before glueing the datum on the bow girder, stern girder and centerboard case was aligned by using a panel pin at each end and a thread stretched between them. Measurements were taken to check the position of each of the frames.


Forward end of centre structure.

Centre Structure